Actioil Treatment Instructions

Vehicle/Machinery Treatment

For best results perform treatment after the fuel filter has been replaced during service.

Instructions below must be followed for treatment to be effective

  1. Perform treatment when a fuel tank is less than ¼ full.
  2. Add Actioil required as per dosage chart above to the fuel tank
  3. Start & run the engine at 1000rpm for 15mins
  4. Fill fuel tank with diesel. (tank must be filled completely)
  5. Ready to go & protected for 1 year or service interval (whichever comes first)

Storage Tank Treatment

  1. Perform treatment when fuel storage tank is less than ¼ full.
  2. Add Actioil required as per the dosage chart above to the tank
  3. Fill tank with diesel. (tank must be filled completely)
  4. Wait 2 Hours
  5. Ready to go & protected for 3 years

Contact Us Today

14 + 7 =

Finol Oils, 3 Stannaway Drive Crumlin Dublin 12 | Tel:+353 01 4555484

preloader